December 2019 – Phase 2 update

The steering committee met with the TDSB and we are so excited to report that Phase 2 of the Field of Dreams will take place in 2020!  Construction drawings will be issued for tender soon.  We will have a brand new track/running trail, a running long jump pit, an eco storage unit and a fantastic new climber combo area (photos below)!  

We want to thank the parents for their on-going support and contributions.

We would also like to thank our corporate donors The Big Carrot, Foodland and Treasure Island, for their ongoing support and generosity!  

We are close to reaching our goal with fundraising. But it’s still not too late to get a personalized, engraved paver that will be installed in the re-design of the schoolyard, with a donation of $500.00.  We already have 70 pavers which will be featured in a very special donor designated area! 

Thank you for supporting the Field of Dreams!
Theodora Rowlands and Liz WestCo – chairs Steering Committee